SOCCER GOALS (URBAN SERIES)
ALCATRAZ
INTEGRATED FUTSAL GOAL
The Alcatraz Futsal / Soccer Goals have been designed for both Indoor and Outdoor use where the goal is integrated with the fence line for a fixed position.
The Alcatraz is designed with a Goal Space of 3m x 0.91m x 2m
Units can be concreted into the ground or put on base plates and then bolted to the concrete slab.
These goals are a great addition to multipurpose courts, half courts, public play areas, schools and residential spaces.
FEATURES
- Galvanised Steel Box Frame Soccer/Futsal System
- 3m x 0.91m x 2m Goal Space
- Great for multipurpose play areas, council grounds, schools & home use
- Designed for both Indoor and Outdoor use
- Situated within the fence-line for seamless integration
- Coated Black with hi gloss paint
- Note: A visual check over the goals should be conducted once a month to ensure the highest level of product performance.
ARIES
INTEGRATED FUTSAL/BASKETBALL GOAL
Photo: Wonga Park, QLD
The Aries system is a combination of both Futsal and Basketball for multipurpose sporting spaces. Aries has been Structurally Certified by a Structural Engineer, where the goal is integrated with the fence line for a fixed position with the Basketball Tower fixed flush behind the goal, or on open court.
This system hosts the same features as the Alcatraz and is designed with a Goal Space of 3m x 0.91m x 2m.
With the addition of the Basketball Tower, the Ring will sit 1.2m inside the Baseline.
Units can be concreted into the ground or put on base plates and then bolted to the concrete slab.
These goals are a great addition to multipurpose courts, half courts, public play areas, schools and residential spaces.
FEATURES
- Galvanised Steel Box Frame with integrated Basketball Unit
- 3m x 0.91m x 2m Goal Space
- Basketball Tower Features: Pro Rim Ring + Net
- B1810p Full Size Polyboard Backboard
- Designed for both Indoor and Outdoor use
- Situated within the fence-line for seamless integration
- Coated Black with hi gloss paint
- Note: A visual check over the goals should be conducted once a month to ensure the highest level of product performance.